Vastu Compliance Analyser
VastuPro
Complete 33-room Vastu check with zone scoring, remedies, and free PDF report. 16-zone Vastu Mandala included.
NirmanShastra — India’s first IS-code construction cost estimation and professional BOQ generation platform
CL. 1.0 — WHY BUDGETS FAIL
CL. 2.0 — SCOPE OF TOOLS
Professional IS-code compliant BOQ for each construction phase
Exact quantities · Local market rates · Contractor-ready format
IS-code verified BOQ · Exact quantities · CPWD labour rates · Contractor comparison
COMPLETE BUNDLE — ALL 5 PAID TOOLS
StructurePro · MasonryPro · ElectricalPro · PlumbingPro · InteriorPro — saves ₹496 vs buying separately
CL. 3.0 — PROCESS
REV A
Answer plain questions about your building — no engineering degree required.
REV B
See live IS code compliance checks as you fill in details.
REV C
Enter your local material rates — we show India averages as a starting point.
REV D
Get exact quantities your contractor cannot argue with — backed by Bureau of Indian Standards.
CL. 3.5 — COMPETITIVE COMPARISON
Free online calculators steal your phone number and sell it to contractors. Here's what you actually get.
| Feature | Free Online Calculators | NirmanShastra (₹499/phase) |
|---|---|---|
| Calculation method | ✗Per sqft thumb rule — meaningless averages | ✓Exact item-wise BOQ based on IS 456, IS 732, IS 1172 |
| Material quantities | ✗Vague guesses (₹8L for cement) | ✓Exact: 412 bags OPC 53, 2.4 tonnes Fe500D steel |
| IS Code compliance | ✗None — not even mentioned | ✓25 IS codes verified, every quantity traceable to a specific clause |
| Contractor accountability | ✗Zero — they sell your data to contractors | ✓Line-by-line comparison — catch overcharging to the decimal |
| Local rates | ✗Fixed city averages you cannot change | ✓You enter local dealer rates — India average pre-filled as benchmark |
| CPWD labour | ✗Not included | ✓14 CPWD trades, productivity rates, fully editable |
| PDF report | ✗No PDF — just a number on screen | ✓Professional 10-page PDF with BOQ, IS compliance, site checklist |
| Your data | ✗Sold to contractor lead networks | ✓Never sold. Your project data is yours. |
The math is universal. IS codes don't change by city. Only the rates do — and you control those.
CL. 4.0 — CODE COMPLIANCE
IS code values in NirmanShastra are verified against BIS publications and locked at source. Every material quantity, mix ratio, and structural parameter traces back to a specific IS clause. M20 is 1:1.5:3 (not 1:2:4). Dry volume factor for concrete is 1.54. For mortar: 1.1.
CL. 5.0 — PRICING · LAUNCH 2026
PHASE 0 — LEAD MAGNET
Vastu Compliance Analyser
forever · no payment required
PER REPORT · ANY PAID TOOL
IS-Code BOQ Estimator
per report · StructurePro to InteriorPro
COMPLETE BUNDLE · ALL 5 PAID TOOLS
All 5 Phase Estimators
saves ₹496 vs buying individually
COMBINE ALL 5 PHASES · ONE MASTER BOQ
Combine all 5 phases into one master report. Phase-wise cost breakdown, construction timeline Gantt chart, combined IS code compliance, and a 12-page contractor-ready PDF.
Free with bundle · ₹2,495 saved vs individual