A lump sum, no quantities
Many quotes give one total. You cannot see how many bags of cement or kilos of steel it counts, so you cannot check it.
For people building their own home
Tell us the size of your house. We work out its frame the way an engineer would, then tell you how much concrete, steel, cement, bricks and sand it needs. Exact quantities, so every quote you get can be checked against them.
The frame is the part that holds the house up: foundation, columns, beams and slabs. Move the sliders and see how an engineer would lay it out.
All floors together1,500 sq ft
Ground floor, seen from above
Laying out the frame…
This is the shape of the frame for a typical plot, with columns about every 3.75 m. Your own plot and plan will change it. How much concrete, steel and cement the frame takes is in the full report.
Want the quantities for your own plan?
The full report sizes every footing, column, beam and slab for your plot, then counts the concrete, the steel by bar size, and the cement, sand and aggregate to buy. Exact quantities. Add your own rates to see the rupees.
How we got this
750 sq ft × 21,500 sq ft750 sq ft × 0.092969.7 m²A typical plot is taken to be 1.3 times as long as it is wide. Columns go about every 3.75 m, which is usual for houses, and never more than 5 m apart. The full report goes on to size each member to IS 456:2000, IS 875 and IS 1893 and counts the materials.
Standards behind itIS 456:2000IS 875:2015IS 1893:2016
Before you sign anything
It is not always dishonest. A quote just rarely says how much of anything it counts. Here is what gets in the way.
Many quotes give one total. You cannot see how many bags of cement or kilos of steel it counts, so you cannot check it.
A single rate per sq ft sounds simple. But brick counts, mortar mix and pipe sizes can quietly change inside it.
Structure, brickwork, electrical, plumbing and interiors are each counted their own way. Nobody puts them into one list of what to buy.
The house, step by step
Watch a small house go up in the order it is really built: the concrete frame first, the walls after, the finish last. Every step is something you have to order, so you know what a quote should count.
Scroll to build the house, or pick a step from the list.
Your reports
Pick the part you are planning. Each report tells you what to order and exactly how much of it, in plain words, ready to hand to your contractor or your dealer. Exact quantities first; add your own rates to see the rupees. Labour is not included. You pay per report.
Start here, free

Check your plan, room by room
See how the old Vastu texts and today’s teachers read each door and room of your plan, and where each rule comes from. Free, with a PDF report.
Quantity reports, one per stage
Exact quantities · item by item · a PDF for your contractor · from ₹999 a report

Foundation, columns, beams and slab
How much concrete, steel and cement your frame needs, member by member and bar size by bar size.

Bricks, plaster and waterproofing
How many bricks or blocks, and how much cement and sand for your walls and plaster. Covers brick, AAC and hollow blocks.

Wiring, switches and earthing
Every circuit planned, with the metres of wire, the points and switches and the distribution board you will need.

Water supply, drains and tank
Metres of pipe by size, the fittings and fixtures, and the right tank size for your home.

Floors, kitchen, paint and ceilings
Pick a finish level and see how much flooring, tile, paint and false ceiling your rooms need.
One buying list for the whole house
Adds the reports you have already bought for one house into a single list. Cement, sand and stone are added across the stages and each stage keeps its own items, in the order a house is built.
An add-on · ₹999 · uses the reports you already have · included in the Complete House Pack
Make my Grand Total Report →Try it yourself
Three small tools you can use right now. Move a slider, see the answer, and open “Show the calculation” only if you want to see how it was worked out.
Inside a column, tall steel bars are held in place by small steel rings called ties. Rings are an easy place to quietly save steel, so it helps to know how many there should be. Move the controls and watch the count change.
Steel rings in one column
26rings
6 more than rings spaced evenly at 150 mm. The extra rings are what keep a column strong in an earthquake.
How we got this
a quarter of 350 mm is 87.5 mm, but never more than 100 mm87.5 mm500 mm · each end zone is the largest of: the column width, a sixth of the height, or 450 mm12150 mm143000 mm ÷ 150 mm20Near the ends of a column the rings sit closer: a quarter of the column width or 100 mm apart, whichever is less. This shows how the rule works; it is not a structural design. Concrete cover over the steel is at least 40 mm in a column.
Standards behind itIS 13920:2016IS 456:2000
A one-brick wall takes 94 to 104 bricks for every square metre, depending on the size of the brick, because the wall is two bricks deep behind the face you see. Pick your brick and wall, then watch one metre go up.
Bricks for your wall
6,000bricks
Plus about 13.9 bags of cement and 102 cft of sand for the mortar between them.
How we got this
100.0 per m² × 60 m²6,0000.23 bags per m² × 60 m²13.9 bags1.70 cft per m² × 60 m²102 cft1 : 61:6Quantities only. Cement and sand are for the mortar between the bricks. The drawing shows one face; the count includes every brick through the thickness. Doors and windows are not taken out here; the MasonryPro report does that.
Standards behind itIS 1077:1992IS 2212:1991
Concrete is sold by grade, like M20 or M25. The number is how hard a test cube can be squeezed after 28 days before it cracks. The harsher the site, the stronger it must be. Pick your site and the size of the pour, then crush the cube.
Concrete grade to ask for
M20or stronger
For the 12 m³ you are pouring, plan on about 96 bags of cement. Your site sets this minimum, so a weaker mix is not allowed.
How we got this
IS 456:2000 Table 5 & 16M20Nominal mix 1 : 1.5 : 3 · 8 × 12 m³96 bags0.55 × 400 kg/m³ × 12 m³2,640 litresM20 uses the nominal-mix cement figure of 8 bags per m³ (CPWD Analysis of Rates 2014). Grade number = characteristic compressive strength in N/mm². The gauge shows that value, not a lab result. Water is a ceiling, not a target. Code ceiling on cement: 450 kg/m³.
Standards behind itIS 456:2000IS 383:2016
Check a quote
A price only means something if you know what it counts. Ask your contractor for the quantities behind the quote: bags of cement, kilos of steel, cubic metres of concrete. Our report counts the same things for your house, with an honest range, and tells you for each line whether it is low, inside the range or high.
Above our range. Ask how the weight was worked out: from cutting lengths with laps, or from a thumb rule. Check that wastage and binding wire are not counted twice.
A picture of how a line reads. The numbers for your own house are in the report. This covers only the frame: footings, columns, beams, slabs and stair. It is not a formal quotation, a rate check or a structural approval.
Why there is a range at all
A quantity worked out from a drawing is still not one exact number: bar lengths are cut and lapped on site, shuttering is reused, and some wastage is unavoidable. The report therefore gives a range around its most likely figure. It is wider for steel and shuttering, which are decided on site, than for concrete, which is measured from the drawing.
Standards behind itIS 456:2000IS 1786:2008
How it works
Tell us about your house in plain words: its size, the floors, where it is. No engineering degree needed.
We lay out the frame the way an engineer would, then check it against Indian building standards. You never see a formula unless you ask for it.
Before you pay, you see the frame we worked out: grid, columns and footings, in 3D. The quantities come with the full report.
A clear list of exactly what to order and how much, based on the Bureau of Indian Standards, with an honest range and a list of what is not counted.
Free calculators vs NirmanShastra
A free calculator is fine for a rough idea. Here is what you get when you want quantities you can take to your contractor.
The arithmetic is the same everywhere. What differs is how much of the house it looks at, and whether it shows its working.
Built on Indian Standards
The quantities in your report are not guesses. They are worked out from the Indian Standards listed here, published by the Bureau of Indian Standards, the same rules your engineer works to. You never have to read them. They are here if you want to check.
The 28 standards behind the reports
Press a standard to tick it off as you check it. A few of the values the free calculators use: M20 concrete is a 1 : 1.5 : 3 mix (not 1 : 2 : 4). The dry volume factor for concrete is 1.54, and for mortar 1.1.
On a house costing ₹30–80 lakh, a single wrong line in a quote (10 extra bags of cement, or 100 kg of extra steel) usually costs more than the report.
Best value
₹4,999one purchase · one house
All five quantity reports for one house: structure, masonry, electrical, plumbing and interior, plus the Grand Total buying list.
Bought one by one: ₹8,094. You save ₹3,095.
Start here
Check your plan against Vastu
FREEalways free · no payment needed
One report at a time
A quantities report for one stage of your build
from ₹999
Electrical or plumbing ₹999 · Masonry ₹1,299 · Interior ₹1,499 · Structure ₹2,299
All of them together
Already bought reports for the same house? The Grand Total adds them into one buying list. Cement, sand and stone are added across the stages, and anything two reports count is counted once.
₹999an add-on to the reports you have bought
Included in the Complete House Pack
Make my Grand Total ReportFree, no sign-up
Small calculators that answer one question each. Type your numbers and get your answer.
Enter the size of your wall and get the brick count, with a small allowance for breakage.
OpenChoose the concrete grade and the volume, and see how much of each to order.
OpenBased on how much water your household uses in a day.
OpenPick the circuit or appliance and see the wire size it needs.
OpenEnter the area and the finish, and get the paint, putty and primer, or the tiles, grout and fixing, with an allowance for waste.
OpenFor builders, contractors and engineers
Six ready-made spreadsheet toolkits for the work that starts once the quote is signed: billing, bar bending schedules, labour and compliance, site records and progress.
For contractors: price a house from IS-code quantities using your own rates, make a client quotation, and compare up to 3 quotes.
₹2,499OpenNine registers holding the proof of what happened on site — the contemporaneous record that holds up when a delay or defect is disputed.
₹1,699OpenTakes measured work through the full Indian billing chain — joint measurement, abstract against BOQ, RA bill with retention/TDS/GST, payment tracking to close.
₹2,299OpenTurns reinforcement details into a cutting-length schedule and steel order note, with every bend deduction and hook allowance applied per code.
₹2,099OpenRuns site payroll end to end under India's current four Labour Codes (in force since Nov 2025) — PF, ESI, minimum wage checks, subcontractor compliance holds.
₹1,999OpenValue-weighted S-curve and earned value tracking, plus a delay/EOT register that classifies events the way a contract actually does — with notice-deadline tracking.
₹2,299OpenFree, no sign-up. Bills, steel cutting lengths, cube tests, wages and progress.
LOCAL RESOURCES
Select your state, city, and material category to open a Google Maps search near you. We do not maintain a dealer directory — this links directly to Google Maps.